Free review

How much it costs to increase your contracted power in Spain (and why lowering it is almost free)

Updated on 26/10/2026 · Voltaris, independent energy advisers in Spain

If the main switch trips whenever the oven and the air conditioning run together, you need more power. If you pay every month for kilowatts you never use, you need less. Both are requested through your supplier, but they don't cost the same.

What you pay when you increase power

When you raise your power, the local distribution company (in most of the province of Alicante, i-DE) charges regulated fees that are the same whichever supplier you use:

FeeApproximate amount (before VAT)When it applies
Extension fee (derechos de extensión)€17.37 per kW addedOnly above the power the grid already recognises for your home
Access fee (derechos de acceso)€19.70 per kW addedEvery time you increase
Connection fee (enganche)€9.04 per changeEvery time the contract is modified
Inspection (verificación)about €8Only if the distributor has to check the installation

VAT is added on top. The amounts come from Royal Decree 1048/2013; your distributor confirms the exact figure before making the change.

A worked example

Going from 3.45 kW to 4.6 kW means adding 1.15 kW:

Total: €51.68 plus VAT, around €62.50, paid once on your next bill. After that, the monthly power charge rises in proportion to the kW you added.

And lowering it?

Lowering power is the cheap direction: usually only the connection fee (about €9 plus VAT), and you save every month afterwards. Many suppliers only accept one power change every 12 months, so it pays to get it right first time.

When you need an electrical certificate

If the new power is above what your electrical installation certificate (the «boletín» or CIE) allows, the distributor may ask for a new one from an authorised electrician. This is common in older homes, or when adding air conditioning, a heat pump or an EV charger.

How long it takes

With a digital meter, the change is usually done remotely within a few days. Your supply is not cut off.

Before you increase: often it is enough to split power differently between peak and off-peak hours. At Voltaris we size your power using your real peaks and handle the paperwork for you, in English.

Frequently asked questions

How much does it cost to increase contracted power in Spain?

About €19.70 per kW in access fees, €17.37 per kW in extension fees if you exceed the recognised power, and about €9 for connection, plus VAT. Adding 1.15 kW costs around €62 including VAT.

How much does it cost to lower contracted power?

Usually just the connection fee, about €9 plus VAT, and you save on every bill afterwards.

How often can I change my contracted power?

Many suppliers only allow one change every 12 months, so calculate it carefully first.

Want to know if you are overpaying?

Send us a photo of your bill. Within 24 hours we tell you exactly how much you can save. Free, in English, no obligation.

Get my free review

Keep reading

Contracted power: how many kW do you need?How to work out the power you really need, what happens if you lower it and how much it saves each year.Best tariff for charging an EVCharge at night, raise only the off-peak power and handle the charger paperwork.