New electricity connection · Palma de Mallorca

Get your electricity connected in Palma de Mallorca without cost surprises.

Before you pay for a new connection in Palma de Mallorca, we check it really is one: many people pay for a new connection when a change of holder was enough. If it is, we tell you what you pay and handle it.

  • Free for you
  • No power cuts
  • Reply within 24 hours

What is included

Everything we do for you.

Checking whether you need a new connection, a change of holder or a change of supplier.

Working out the regulated fees and warning you if a certificate or a deposit will be needed.

Handling the connection with the supplier and the distributor.

Helping with the cancellation of a supply you no longer use or with a reconnection.

In your area · Palma de Mallorca

New electricity connection in Palma de Mallorca: what we see here.

Palma has international residents year-round as well as many renovated flats in the old town and in districts such as Santa Catalina and El Terreno.

Santa CatalinaEl TerrenoPortixolSon ArmadansEs MolinarPlaya de Palma

In Mallorca the network belongs to Endesa (e-distribución). It appears on your bill as the distributor and does not change when you switch supplier.

Change of account holder after buying or renting

If you have just bought, we put the electricity in your name and choose a sensible tariff from day one, without relying on the agent.

How it works

Three steps. Only the first is yours.

1

Tell us your case

Whether the property is new, whether it had power recently or whether the contract is in someone else's name.

2

We tell you what you pay

Regulated fees, certificate and deposit, before you sign anything.

3

We handle it

We submit the connection and tell you when it is done.

Before you start

What you need, what it costs and how long it takes.

What you need

  • ID, NIE or passport of the holder.
  • The CUPS of the property, if it already exists.
  • The deeds, or the purchase or rental contract.
  • The installation certificate (boletín or CIE) if the property is new, has been refurbished or has been disconnected for a long time.
  • IBAN of the account for the direct debit.

How much it costs

It depends on the case. Changing supplier is free and a change of holder usually is too if you keep the same power. Only a genuine new connection carries regulated fees. At 4.6 kW, a full new connection in a new home can be around €180–200 plus VAT; if the property had power recently, it is much lower. The certificate has no regulated price: ask the electrician for a quote.

How long it takes

If the installation is in order, a new connection is usually done in one or two weeks. If the certificate is missing, the clock starts when you have it.

ItemApproximate amount (before VAT)When it applies
Extension feeAbout €17.37 per kWNew homes, or if you ask for more power than before
Access feeAbout €19.70 per kWAlmost always on a new connection
Connection feeAbout €9When the supply has to be physically connected
Verification feeAbout €8If the distributor inspects the installation

Amounts from Royal Decree 1048/2013, charged by the distributor through your supplier.

The quickest way

We'll call you

Don't have your bill to hand? Leave your name and phone number and an advisor will call you to explain everything.

Or message us on WhatsApp now

What our customers say

5.0 · 17 Google reviews

«They deliver what they promise and on top of that they follow up well. Very happy with Eloy and the team.»Google · Translated from Spanish
«Eloy deserves a 10 out of 10: my electricity contract is cheaper now. 100% recommended!»Google · Translated from Spanish

FAQ

Your questions, answered.

It depends. In a new home at 4.6 kW the regulated fees can be around €180–200 plus VAT. If the property had a supply recently the cost is much lower, and if you only change the holder and keep the power it is usually free.

Yes in new homes, after a refurbishment of the installation, or when the supply has been disconnected for a long time and the earlier certificate has expired. An authorised electrician issues it.

No. Everything is done by WhatsApp, phone or the website, with a phone photo and no travelling. If you like, we call you to explain it.

Almost everything is done by WhatsApp, in English: send us your bill, get your review within 24 hours and we handle the switch without you going anywhere.

It depends. In a new home at 4.6 kW the regulated fees can be around €180–200 plus VAT. If the property had a supply recently the cost is much lower, and if you only change the holder and keep the power it is usually free.

Yes in new homes, after a refurbishment of the installation, or when the supply has been disconnected for a long time and the earlier certificate has expired. An authorised electrician issues it.

You tell us,
we sort it out.

Paperwork, a question or a bill that doesn't add up: message us and we'll tell you how we'll handle it.

Talk to an advisor