Increase or reduce contracted power · Jávea (Xàbia)

Match your contracted power in Jávea (Xàbia) to what you actually use.

You pay for contracted power every day, whether you use it or not. In Jávea (Xàbia) we work out how much you need and handle the change with your supplier and the distributor.

  • Free for you
  • No power cuts
  • Reply within 24 hours

What is included

Everything we do for you.

Working out the power from your real peaks, not a rule of thumb.

Checking whether spreading the power better between peak and off-peak, or a two-power tariff, is enough.

Handling the change with the supplier and the distributor.

Asking for a new certificate only if the new power requires it, and telling you first.

In your area · Jávea (Xàbia)

Increase or reduce contracted power in Jávea (Xàbia): what we see here.

Large villas on the slopes of the Montgó and at Cap de la Nau, apartments at the Arenal and the port: Jávea has many homes with pools, air conditioning and owners who live abroad part of the year.

El ArenalPuertoCasco antiguoMontgóPortitxolCap de la NauTosalet

In most of the province of Alicante the network belongs to i-DE, part of the Iberdrola group. It appears on your bill as the distributor and does not change when you switch supplier.

Large villas with a pool

High summer use: with power set to your real peaks and the pool pump in off-peak hours, it shows every month.

How it works

Three steps. Only the first is yours.

1

Send us your bill

From it we see your current power, your meter and your usage. With a digital meter we also look at your peaks.

2

We work out the right power

We tell you whether to raise it, lower it or leave it, and how much your bill changes.

3

We handle the change

With a digital meter the change is usually done remotely within a few days, with no power cut.

Before you start

What you need, what it costs and how long it takes.

What you need

  • A recent bill (a phone photo is fine).
  • If you will raise the power: what you are adding (air conditioning, heat pump, car charger).
  • The installation certificate (boletín or CIE), if you have it.

How much it costs

When you increase the power, the distributor charges regulated fees, the same with any supplier. Approximate amounts, before VAT; your distributor confirms the exact figure before the change. Reducing is the cheapest: normally only the connection fee. Our service is free for you.

How long it takes

With a digital meter it is usually done remotely within a few days, with no power cut. Many suppliers only accept one power change every 12 months, so it pays to get it right the first time.

ItemApproximate amount (before VAT)When it applies
Extension fee€17.37 per kW addedOnly if you exceed the power the grid already recognises for your home
Access fee€19.70 per kW addedWhenever you increase
Connection fee€9.04 per operationWhenever the contract is modified
VerificationAbout €8Only if the distributor inspects the installation

Amounts from Royal Decree 1048/2013. Example: going from 3.45 kW to 4.6 kW (1.15 kW) is about €51.68 plus VAT, around €62.50, one time only.

The quickest way

We'll call you

Don't have your bill to hand? Leave your name and phone number and an advisor will call you to explain everything.

Or message us on WhatsApp now

FAQ

What people ask us most.

Almost always in holiday homes and homes with little use: every kW too many costs about €40 to €50 a year, whether you use the house or not. Reducing it usually costs only the connection fee, about €9 plus VAT.

About €19.70 per kW in access fees, €17.37 per kW in extension fees if you exceed the recognised power, and about €9 connection fee, plus VAT. Adding 1.15 kW costs around €62 with VAT.

No. Everything is done by WhatsApp, phone or the website, with a phone photo and no travelling. If you like, we call you to explain it.

24 hours from when we get the bill. If there are several (electricity and gas, or several homes), we review them all together.

About €19.70 per kW in access fees, €17.37 per kW in extension fees if you exceed the recognised power, and about €9 connection fee, plus VAT. Adding 1.15 kW costs around €62 with VAT.

Normally only the connection fee, about €9 plus VAT, and you save on every bill.

Whatever you need with your energy,
we take care of it.

Paperwork, a question or a bill that doesn't add up: message us and we'll tell you how we'll handle it.

Talk to an advisor